Bathymetric

Survey plans will be prepared as guidance during a bathymetry survey. Collecting data is done by tracking the river/sea according to the planed routes. The routes are made every 10-15 meters depending on the width of the river/survey. Data correction is needed to justify the results, taking into account water levels, tides and a tranducer offset measurement.

There are 2 Bathymetry Surveys :